Assessment and verification of constancy of performance system**

Elements of assessment and verification of constancy of performance system
(obligations of accredited body)

Type of issued document
/ product marking

1+
  1. Assessment of product’s performance carried out on the basis of testing, calculation, tabulated values or descriptive documentation of the product,
  2. Initial inspection of factory and factory production control (FPC),
  3. Issuing national certificate of constancy of performance,
  4. Continuation of surveillance and evaluation of FPC,
  5. Audit testing of samples taken at the manufacturing plant or manufacturer’s warehouse.

National Certificate of Constancy of Performance / Construction mark „B”

 

Example of marking:

063-UWB-xxxx


(where: 063 – number of CNBOP-PIB Certification Department accreditation,
UWB – abbreviation of the Law [1],
xxxx – number of certificate)

1
  1. Assessment of product’s performance carried out on the basis of testing, calculation, tabulated values or descriptive documentation of the product,
  2. Initial inspection of factory and factory production control (FPC),
  3. Issuing national certificate of constancy of performance,
  4. Continuation of surveillance and evaluation of FPC.
2+
  1. Initial inspection of factory and factory production control (FPC),
  2. Issuing national certificate of conformity of factory production control,
  3. Continuation of surveillance and evaluation of FPC.

National Certificate of Conformity of Factory Production Control / Construction mark „B”

 

Example of marking:

063-UWB-xxxx


(where: 063 – number of CNBOP-PIB Certification Department accreditation,
UWB – abbreviation of the Law [1],
xxxx – number of certificate)

* According to regulation [1]

** As above.