Form to order a test

    1. Application for conducting tests at the CNBOP-PIB Laboratory Teams:
    2. Type of device:
    3. Name of the device/product:
    4. Compliance with (choose at least one):
    5. Additional Information:

    Test report (select applicable options):
    8. Information for preparing the contract for testing:
    10. Attachments (may be provided in electronic form):

    The principles regarding data processing by CNBOP-PIB are defined in the Privacy policy available on our website.

    10. Place of conducting tests (selectable – multiple locations possible):
    11. Name and address:

    The principles regarding the processing of data by CNBOP-PIB are specified in the Privacy policy available on our website.

    11. The applicant is:
    13. Purpose of testing:
    14. Sprinklers after the operating period:
    Results presentation method (selectable):
    15. Documents attached to the application (selectable):

    The principles regarding the processing of data by CNBOP-PIB are specified in the Privacy policy available on our website.

    10. The Client is:
    (Note: For tests carried out under the 3 OIWSWU system for CE marking purposes, the client should be the entity acting as the manufacturer (in accordance with Regulation (EU) No 305/2011 of the European Parliament and the Council)):
    13. Purpose and scope of testing (select applicable):
    CE marking in the system (select below):
    Marking with the construction mark B in the system (select below):
    14. Tests for CE product marking:
    15. Tests for marking the product with the construction mark B:
    16. Attachments:
    18. Additional information and requirements:

    If the purpose of the tests is to obtain a European or national technical assessment, you should first contact the technical assessment body.

    If the purpose of the tests is to assess the performance of the product in system 3, the Client, along with the samples for testing, should provide a sampling protocol (according to the template sent by CNBOP-PIB).

    In the case of tests for the purpose of assessing the performance of the product in system 3 in terms of fire reaction, the Client, along with the samples for testing, should provide a declaration of no use of additives improving the flammability properties of the product at any stage of production (if applicable).

    In the case of tests in systems 1 and 1+, the Client, along with the samples for testing, should provide a sampling protocol (for products covered by a harmonized standard for CE marking purposes or a product covered by a Polish Standard for B marking purposes – protocol by the certification body) or a declaration that the sample is a prototype. Moreover, before starting tests for compliance with the standard, it is necessary to contact the certification body where the Client intends to carry out the certification process, to agree on the details of the certification process and provide all agreements (together with the sampling protocol containing the information as per item 2) to the Laboratory.

    The principles regarding data processing by CNBOP-PIB are specified in the Privacy policy available on our website.

    The submitted application is subject to formal evaluation. Failure to provide all necessary data may delay the start of testing.